NPS® Top-Down

The single-span NPS® Top-Down system exclusively employs self-supporting NPS® beams, placed on perimeter diaphragms. In this way, the beams perform both the function of a temporary strut, counteracting wall deformation, and that of a permanent load-bearing element. This solution eliminates the need for temporary struts and allows for a high speed of construction.

  • Total self-supporting beams
  • Containment of excavation within the site perimeter
  • Speed of execution
  • Possibility of visible beams without additional finishing

Common application areas include:

  • underground car parks
  • infrastructure such as underground lines
  • large buildings with underground floors

Tecnostrutture’s technical team offers personalised advice and technical support from the initial stages right through to project completion.

This includes:

  • Preliminary technical consulting – e.g. identification of the ideal structural mesh
  • Optimisation of the solution and/or conversion of the project to an NPS® solution
  • BIM modelling of NPS® structures
  • Design of NPS® structures with calculation report and executive drawings
  • Certifications

Optional services:

  • FEM modelling of the building
  • BIM modelling of the building

One of the most innovative features of this solution is the possibility of carrying out the excavation and structure installation phases simultaneously. This means that while excavation is taking place, beams are immediately placed to support the perimeter bulkheads, guaranteeing the stability of the excavation itself. This mode of operation, referred to as ‘covered excavation’, allows construction to proceed safely and efficiently, reducing construction time and minimising impact on the surroundings.

For decades, the NPS® Top-Down system has been successfully used in many projects, from residential buildings to car parks and infrastructure.

The reason? The solution gives the possibility to carry out the excavation and laying phases of the structures simultaneously, guaranteeing speed and high construction flexibility. In addition, the general planner can count on Tecnostrutture’s engineering support for more efficient and simpler construction.

More Top-down

Complete the system

The word from customers

Approfondimenti

Tecnostrutture obtains two CSTB ATECs for the French market

Tecnostrutture’s 2025 Sustainability Report is now online

11.01–15.01.27 | See you at BAU 2027!

Request more information

Request information for the product: NPS® Top-Down