NPS®Safety
NPS® New Performance Slim-System is a complete and flexible modular system developed by Tecnostrutture. It consists of composite steel-concrete beams and columns, made from up to 93% recycled steel and equipped with an Environmental Product Declaration based on Life Cycle Assessment per kg of product.
NPS® offers:
- Fast and easy assembly
- CE marked structural elements EN 1090-1
- Reduced load on foundations
- Integrated fire resistance
- Seismic resistance
- Slim sections
- One supplier for all structural elements of the building
The NPS® System Life Cycle
NPS® System contributes to reducing environmental impact throughout the life cycle and to obtaining LEED and DGNB credits.
Produced in the factory, the elements are assembled on site in total self-supporting manner, eliminating the need for temporary formwork and shoring, thus speeding up construction time. After concrete casting, NPS® results in a composite structure with characteristics that comply with the performance levels required by the Eurocodes and Italian NTC 2018.
Numerous application areas
NPS® is used in numerous application areas: tertiary, industry, residential, infrastructure, car parks, bridges.
It is the ideal solution for large spans, operations in seismic zones and contexts where fast and sustainable construction is required.
History of NPS®
1967
REP® beam was born
In 1967, engineer Salvatore Leone designed a composite metal beam for slabs and roofs, anticipating the REP® beam, whose patent was filed on 28 July.
1968
First REP® calculation procedure
1969
First Positive Opinion of the C.S.LL.PP. on REP®
From 1972
Deposit of further REP® Patents
2000-2012
Tecnostrutture and REP®
In 2000, Tecnostrutture s.r.l. began collaboration for the production and distribution of the REP System.
From 2001 Tecnostrutture began an intense research activity both in Italy and abroad on beams and columns, on the seismic resistance of REP® nodes and on the rigidity of structures.
2013
NPS® is born
The evolution of composite concrete structures, NPS®, is Tecnostrutture’s high-performance, seismic-resistant construction technology, including beam, column, slab and certified CE EN-1090-1.
NPS® Advantages
Fast return on investment
- Reduction of building construction time by at least 40% compared to traditional systems, ideal for new construction and renovation.
- Reliable costs.
- Less dependence on weather conditions.
- Overlapping construction phases for greater worksite speed.
Efficient and safe solution
- Speed of installation: 8 minutes for a multi-storey column, 5 for a beam.
- Reduction of labour requirements on site by 90%.
- Increased safety on site.
- Almost total elimination of props.
- Delivery of beams, columns and slabs at the time of installation, without the need for storage space.
Reduced environmental impact
- Environmental Product Declaration (EPD), crediti LEED e conformità ai CAM.
- Up to 93% recycled steel content.
- Lower use of raw materials compared to traditional systems, with the same performance.
- 90% reduction of temporary materials on site, with positive effects on costs and waste.
- Lower energy consumption and CO₂ emissions than steel and reinforced concrete solutions.
- Environmental impact demonstrated per kg of product through Life Cycle Assessment (LCA)
Seismic and integrated fire resistance
- Integrated fire resistance, with no need for post-installation treatment. A saving in terms of cost and time.
- Integrated seismic resistance, without the need for bracing.
- Consolidated experience of Tecnostrutture in seismic areas.
- NPS® elements can also be used as visible architectural elements, without the need for additional treatments.
The customer's word
The customer's word
Working with Tecnostrutture has been an extremely positive experience: NPS® System is a truly innovative and more functional method compared to traditional systems.
Ing. Salvatore Burgio
C.M.C Ravenna
Serenity on site
On a construction site you need peace of mind, and with this team we had it. The NPS assembly contact person® was always present and I knew that he had the entire assembly of beams and columns under control.
Federico Fernicola
Site Manager Salc
Speed of construction
For the Eurosky Tower, keeping to time was essential. The use of NPS® System ensured fast construction without compromising on quality.