Efficient and safe solution

  • As a rule, three workers and a crane operator erect a multi-storey column in 8 minutes. In a single operation, pillars for two or more floors are installed.
  • An average of 80% less manpower is used on site compared to traditional systems. Strategic activities are carried out offsite and CE marked.
  • Increased safety due to the substantial reduction of manpower on site and the safety systems integrated in the NPS® elements.
  • There is no need for a storage area because the elements are designed to be assembled, taken directly from the means of transport.
  • Provisional material is drastically reduced, with benefits in terms of sustainability. In addition, NPS® products arrive at the construction site without packaging, solving this type of waste management at source.
Require information