As a rule, three workers and a crane operator erect a multi-storey column in 8 minutes. In a single operation, pillars for two or more floors are installed.
An average of 80% less manpower is used on site compared to traditional systems. Strategic activities are carried out offsite and CE marked.
Increased safety due to the substantial reduction of manpower on site and the safety systems integrated in the NPS® elements.
There is no need for a storage area because the elements are designed to be assembled, taken directly from the means of transport.
Provisional material is drastically reduced, with benefits in terms of sustainability. In addition, NPS® products arrive at the construction site without packaging, solving this type of waste management at source.