Efficient and safe solution

  • Laying speed: 8 minutes for a multi-storey column, 5 for a beam.
  • Reduction of 80% of labour requirements on site.
  • Increased safety on site.
  • Almost total elimination of props on site.
  • Delivery of beams, columns and slabs at the time of installation, without the need for storage space.